draft-ietf-iasa-bcp-07.txt draft-ietf-iasa-bcp-06.txt
Network Working Group R. Austein, Ed. Network Working Group R. Austein, Ed.
Internet-Draft ISC Internet-Draft ISC
Expires: August 15, 2005 B. Wijnen, Ed. Expires: August 2, 2005 B. Wijnen, Ed.
Lucent Technologies Lucent Technologies
February 11, 2005 February 1, 2005
Structure of the IETF Administrative Support Activity (IASA) Structure of the IETF Administrative Support Activity (IASA)
draft-ietf-iasa-bcp-06
draft-ietf-iasa-bcp-07
Status of this Memo Status of this Memo
This document is an Internet-Draft and is subject to all provisions This document is an Internet-Draft and is subject to all provisions
of Section 3 of RFC 3667. By submitting this Internet-Draft, each of section 3 of RFC 3667. By submitting this Internet-Draft, each
author represents that any applicable patent or other IPR claims of author represents that any applicable patent or other IPR claims of
which he or she is aware have been or will be disclosed, and any of which he or she is aware have been or will be disclosed, and any of
which he or she become aware will be disclosed, in accordance with which he or she become aware will be disclosed, in accordance with
RFC 3668. RFC 3668.
Internet-Drafts are working documents of the Internet Engineering Internet-Drafts are working documents of the Internet Engineering
Task Force (IETF), its areas, and its working groups. Note that Task Force (IETF), its areas, and its working groups. Note that
other groups may also distribute working documents as other groups may also distribute working documents as
Internet-Drafts. Internet-Drafts.
Internet-Drafts are draft documents valid for a maximum of six months Internet-Drafts are draft documents valid for a maximum of six months
and may be updated, replaced, or obsoleted by other documents at any and may be updated, replaced, or obsoleted by other documents at any
time. It is inappropriate to use Internet-Drafts as reference time. It is inappropriate to use Internet-Drafts as reference
material or to cite them other than as "work in progress." material or to cite them other than as "work in progress."
The list of current Internet-Drafts can be accessed at The list of current Internet-Drafts can be accessed at
http://www.ietf.org/ietf/1id-abstracts.txt. http://www.ietf.org/ietf/1id-abstracts.txt.
The list of Internet-Draft Shadow Directories can be accessed at The list of Internet-Draft Shadow Directories can be accessed at
http://www.ietf.org/shadow.html. http://www.ietf.org/shadow.html.
This Internet-Draft will expire on August 15, 2005. This Internet-Draft will expire on August 2, 2005.
Copyright Notice Copyright Notice
Copyright (C) The Internet Society (2005). Copyright (C) The Internet Society (2005).
Abstract Abstract
This document describes the structure of the IETF Administrative This document describes the structure of the IETF Administrative
Support Activity (IASA) as an activity housed within the Internet Support Activity (IASA) as an IETF-controlled activity housed within the Internet
Society (ISOC). It defines the roles and responsibilities of the Society (ISOC) legal umbrella. It defines the roles and responsibilities of the
IETF Administrative Oversight Committee (IAOC), the IETF IETF Administrative Oversight Committee (IAOC), the IETF
Administrative Director (IAD), and ISOC in the fiscal and Administrative Director (IAD), and ISOC in the fiscal and administrative support of the IETF standards process. It
Austein & Wijnen Expires August 15, 2005 [Page 1] Austein & Wijnen Expires August 2, 2005 [Page 1]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
administrative support of the IETF standards process. It also also
defines the membership and selection rules for the IAOC. defines the membership and selection rules for the IAOC.
Table of Contents Table of Contents
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . 4 1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1 Open Issues . . . . . . . . . . . . . . . . . . . . . . . 5 1.1 Open Issues . . . . . . . . . . . . . . . . . . . . . . . 4
2. Definitions and Principles . . . . . . . . . . . . . . . . . 5 2. Definitions and Principles . . . . . . . . . . . . . . . . . . 4
2.1 Alphabet Soup . . . . . . . . . . . . . . . . . . . . . . 6 2.1 Alphabet Soup . . . . . . . . . . . . . . . . . . . . . . 5
2.2 Principles of the IASA, IETF and ISOC relationship . . . . 6 2.2 Principles of the IASA, IETF and ISOC relationship . . . . 5
2.3 Community Consensus and Grant of Authority . . . . . . . . 7 2.3 Community Consensus and Grant of Authority . . . . . . . . 6
2.4 Termination and Change . . . . . . . . . . . . . . . . . . 7 2.4 Termination and Change . . . . . . . . . . . . . . . . . . 6
2.5 Effective Date for Commencement of IASA . . . . . . . . . 7 2.5 Effective Date for Commencement of IASA . . . . . . . . . 6
3. Structure of the IASA . . . . . . . . . . . . . . . . . . . 8 3. Structure of the IASA . . . . . . . . . . . . . . . . . . . . 7
3.1 IAD Responsibilities . . . . . . . . . . . . . . . . . . . 9 3.1 IAD Responsibilities . . . . . . . . . . . . . . . . . . . 8
3.2 IAOC Responsibilities . . . . . . . . . . . . . . . . . . 11 3.2 IAOC Responsibilities . . . . . . . . . . . . . . . . . . 10
3.3 Relationship of the IAOC to Existing IETF Leadership . . . 12 3.3 Relationship of the IAOC to Existing IETF Leadership . . . 11
3.4 IAOC Decision Making . . . . . . . . . . . . . . . . . . . 12 3.4 IAOC Decision Making . . . . . . . . . . . . . . . . . . . 11
3.5 Review and Appeal of IAD and IAOC Decision . . . . . . . . 12 3.5 Review and Appeal of IAD and IAOC Decision . . . . . . . . 11
4. IAOC Membership, Selection and Accountability . . . . . . . 14 4. IAOC Membership, Selection and Accountability . . . . . . . . 13
4.1 Initial IAOC Selection . . . . . . . . . . . . . . . . . . 16 4.1 Initial IAOC Selection . . . . . . . . . . . . . . . . . . 15
5. IASA Funding . . . . . . . . . . . . . . . . . . . . . . . . 16 5. IASA Funding . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.1 Cost Center Accounting . . . . . . . . . . . . . . . . . . 16 5.1 Cost Center Accounting . . . . . . . . . . . . . . . . . . 15
5.2 IETF Meeting Revenues . . . . . . . . . . . . . . . . . . 17 5.2 IETF Meeting Revenues . . . . . . . . . . . . . . . . . . 16
5.3 Designated Donations, Monetary and In-Kind . . . . . . . . 17 5.3 Designated Donations, Monetary and In-Kind . . . . . . . . 16
5.4 Other ISOC Support . . . . . . . . . . . . . . . . . . . . 17 5.4 Other ISOC Support . . . . . . . . . . . . . . . . . . . . 16
5.5 IASA Expenses . . . . . . . . . . . . . . . . . . . . . . 17 5.5 IASA Expenses . . . . . . . . . . . . . . . . . . . . . . 16
5.6 Operating Reserve . . . . . . . . . . . . . . . . . . . . 17 5.6 Operating Reserve . . . . . . . . . . . . . . . . . . . . 17
6. IASA Budget Process . . . . . . . . . . . . . . . . . . . . 18 6. IASA Budget Process . . . . . . . . . . . . . . . . . . . . . 17
7. ISOC Responsibilities for IASA . . . . . . . . . . . . . . . 19 7. ISOC Responsibilities for IASA . . . . . . . . . . . . . . . . 18
8. Security Considerations . . . . . . . . . . . . . . . . . . 20 8. Security Considerations . . . . . . . . . . . . . . . . . . . 19
9. IANA Considerations . . . . . . . . . . . . . . . . . . . . 20 9. IANA Considerations . . . . . . . . . . . . . . . . . . . . . 19
10. Acknowledgements . . . . . . . . . . . . . . . . . . . . . . 20 10. Acknowledgements . . . . . . . . . . . . . . . . . . . . . . 19
11. References . . . . . . . . . . . . . . . . . . . . . . . . . 21 11. References . . . . . . . . . . . . . . . . . . . . . . . . . 20
11.1 Normative References . . . . . . . . . . . . . . . . . . 21 11.1 Normative References . . . . . . . . . . . . . . . . . . . . 20
11.2 Informative References . . . . . . . . . . . . . . . . . 21 11.2 Informative References . . . . . . . . . . . . . . . . . . . 20
Authors' Addresses . . . . . . . . . . . . . . . . . . . . . 22 Authors' Addresses . . . . . . . . . . . . . . . . . . . . . . 21
A. Change Log . . . . . . . . . . . . . . . . . . . . . . . . . 22 A. Change Log . . . . . . . . . . . . . . . . . . . . . . . . . . 21
A.1 Changes in draft-ietf-iasa-bcp-07.txt . . . . . . . . . . 22 A.1 Changes in draft-ietf-iasa-bcp-06.txt . . . . . . . . . . 21
A.2 Changes in draft-ietf-iasa-bcp-06.txt . . . . . . . . . . 23 A.2 Changes in draft-ietf-iasa-bcp-05.txt . . . . . . . . . . 22
A.3 Changes in draft-ietf-iasa-bcp-05.txt . . . . . . . . . . 23 A.3 Changes in draft-ietf-iasa-bcp-04.txt . . . . . . . . . . 23
A.4 Changes in draft-ietf-iasa-bcp-04.txt . . . . . . . . . . 24 A.4 Changes in draft-ietf-iasa-bcp-03.txt . . . . . . . . . . 24
A.5 Changes in draft-ietf-iasa-bcp-03.txt . . . . . . . . . . 25 A.5 Changes in draft-ietf-iasa-bcp-02.txt . . . . . . . . . . 25
A.6 Changes in draft-ietf-iasa-bcp-02.txt . . . . . . . . . . 26 A.6 Changes in draft-ietf-iasa-bcp-01.txt . . . . . . . . . . 26
A.7 Changes in draft-ietf-iasa-bcp-01.txt . . . . . . . . . . 27 A.7 Changes in draft-ietf-iasa-bcp-00.txt . . . . . . . . . . 26
A.8 Changes in draft-ietf-iasa-bcp-00.txt . . . . . . . . . . 27 A.8 Changes in draft-wasserman-iasa-bcp-01.txt . . . . . . . . 27
A.9 Changes in draft-wasserman-iasa-bcp-01.txt . . . . . . . . 28 A.9
A.10 Origin of draft-wasserman-iasa-bcp-00.txt . . . . . . . 28 Origin of draft-wasserman-iasa-bcp-00.txt . . . . . . . . 27
Austein & Wijnen Expires August 15, 2005 [Page 2]
Internet-Draft Structure of IASA February 2005
Intellectual Property and Copyright Statements . . . . . . . 29 Intellectual Property and Copyright Statements . . . . . . . . 28
Austein & Wijnen Expires August 15, 2005 [Page 3] Austein & Wijnen Expires August 2, 2005 [Page 2]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
1. Introduction 1. Introduction
This document describes the structure of the IETF Administrative This document describes the structure of the IETF Administrative
Support Activity (IASA) as an activity housed within the Internet Support Activity (IASA) as an IETF-controlled activity housed within the Internet
Society (ISOC). It defines the roles and responsibilities of the Society (ISOC) legal umbrella. It defines the roles and responsibilities of the
IETF Administrative Oversight Committee (IAOC), the IETF IETF Administrative Oversight Committee (IAOC), the IETF
Administrative Director (IAD), and ISOC in the fiscal and Administrative Director (IAD), and ISOC in the fiscal and
administrative support of the IETF standards process. It also administrative support of the IETF standards process. It also
defines the membership and selection rules for the IAOC. defines the membership and selection rules for the IAOC.
The IETF undertakes its technical activities as an ongoing, open, The IETF undertakes its technical activities as an ongoing, open,
consensus-based process. This document defines an administrative consensus-based process. This document defines an administrative
support structure intended to be responsive to the administrative support structure intended to be responsive to the administrative
needs of the IETF technical community, and describes how that support needs of the IETF technical community, and describes how that support
structure fits under ISOC's organizational umbrella. This document structure fits under ISOC's organizational umbrella. This document
does not affect the ISOC-IETF working relationship as it relates to does not affect the ISOC-IETF working relationship as it relates to
standards development or the communication of technical advice standards development or the communication of technical advice
relevant to the policy and educational goals of ISOC. relevant to the policy and educational goals of ISOC.
The IETF Administrative Support Activity (IASA) provides the The IETF Administrative Support Activity (IASA) provides the
administrative structure required to support the IETF standards administrative structure required to support the IETF standards
process and to support the IETF's technical activities. As of the process and to support the IETF's technical activities. As of the
time at which this document was written, this included the work of time at which this document was written, this included the work of
IETF working groups, the IESG, the IAB, and the IRTF. Should the IETF working groups, the IESG, the IAB, and the IRTF. Should the
IETF standards process at some future date come to include other IETF standards process at some future date come to include other
technical activities, the IAOC is responsible for developing plans to technical activities, the IASA shall
provide administrative support for them. Such support includes, as provide administrative support for those activities as well. Such support includes, as
appropriate, undertaking or contracting for the work described in appropriate, undertaking or contracting for the work described in
[RFC3716], including IETF document and data management, IETF [RFC3716], including IETF document and data management, IETF
meetings, and any operational agreements or contracts with the RFC meetings, and any operational agreements or contracts with the RFC
Editor and IANA. The IASA is also ultimately responsible for the Editor and IANA. The IASA is also ultimately responsible for the
financial activities associated with IETF administrative support such financial activities associated with IETF administrative support such
as collecting IETF meeting fees, paying invoices, managing budgets as collecting IETF meeting fees, paying invoices, managing budgets
and financial accounts, and so forth. and financial accounts, and so forth.
The IASA is responsible for ensuring that the IETF's administrative The IASA is responsible for ensuring that the IETF's administrative
needs are met, and met well. The IETF does not expect the IASA to needs are met, and met well. The IETF does not expect the IASA to
undertake the bulk of this work directly; rather, the IETF expects undertake the bulk of this work directly; rather, the IETF expects
the IASA to contract this work from others, and manage these the IASA to contract this work from others, and manage these
contractual relationships to achieve efficiency, transparency and contractual relationships to achieve efficiency, transparency and
cost effectiveness. cost effectiveness.
The IASA is distinct from IETF-related technical functions, such as The IASA is distinct from IETF-related technical functions, such as
the RFC Editor, the Internet Assigned Numbers Authority (IANA), and the RFC Editor, the Internet Assigned Numbers Authority (IANA), and
the IETF standards process itself. The IASA has no influence on the the IETF standards process itself. The IASA has no influence on the
technical decisions of the IETF or on the technical contents of IETF technical decisions of the IETF or on the technical contents of IETF
work. Note, however, that this in no way prevents people who form work. Note, however, that this in no way prevents people who form
part of the IASA from participating as individuals in IETF technical part of the IASA from participating as individuals in IETF technical
Austein & Wijnen Expires August 15, 2005 [Page 4] Austein & Wijnen Expires August 2, 2005 [Page 3]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
activities. activities.
1.1 Open Issues 1.1 Open Issues
Note to RFC Editor: Please remove this section prior to Note to RFC Editor: Please remove this section prior to
publication. publication.
At this time (when submitting the revision 06 of this document) there At this time (when submitting the revision 06 of this document) there
are no known open issues. are no known open issues.
A kind volunteer is now keeping reasonably up-to-date status of each A kind volunteer is now keeping reasonably up-to-date status of each
known open issue and this is available in an online tracking system: known open issue and this is available in an online tracking system:
URL: https://rt.psg.com URL: https://rt.psg.com
Username: ietf Username: ietf
Password: ietf Password: ietf
Queue: iasa-bcp Queue: iasa-bcp
The "status" of each tracked issue is stored in a "custom field" The "status" of each tracked issue is stored in a "custom field"
named "Discussion". That status is also mapped onto the system's named "Discussion". That status is also mapped onto the system's
priority field, so you can see it in the list of tickets and so you priority field, so you can see it in the list of tickets and so you
can sort on it. The mapping is as follows: can sort on it. The mapping is as follows:
1. No discussion 1. No discussion
2. No consensus 2. No consensus
3. Text Needed 3. Text Needed
4. Text Proposed 4. Text Proposed
5. Text Accepted 5. Text Accepted
6. No change proposed 6. No change proposed
7. No change needed 7. No change needed
8. Document Updated 8. Document Updated
Please be sure to check the issue tracker for the latest status of Please be sure to check the issue tracker for the latest status of
all tracked issues. all tracked issues.
2. Definitions and Principles 2. Definitions and Principles
This section describes terminology and underlying principles used in This section describes terminology and underlying principles used in
Austein & Wijnen Expires August 15, 2005 [Page 5] Austein & Wijnen Expires August 2, 2005 [Page 4]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
the rest of this document. the rest of this document.
2.1 Alphabet Soup 2.1 Alphabet Soup
Although most of the terms, abbreviations, and acronyms used in this Although most of the terms, abbreviations, and acronyms used in this
document are reasonably well-known, first-time readers may find this document are reasonably well-known, first-time readers may find this
alphabet soup confusing. This section therefore attempts to provide alphabet soup confusing. This section therefore attempts to provide
a quick summary. a quick summary.
IAB: Internet Architecture Board (see [RFC2026], [RFC2850]). IAB: Internet Architecture Board (see [RFC2026], [RFC2850]).
IAD: IETF Administrative Director, defined by this document. IAD: IETF Administrative Director, defined by this document.
IAOC: IETF Administrative Oversight Committee, defined by this IAOC: IETF Administrative Oversight Committee, defined by this
document. document.
IASA: IETF Administrative Support Activity, defined by this document. IASA: IETF Administrative Support Activity, defined by this document.
IESG: Internet Engineering Steering Group (see [RFC2026], [RFC3710]). IESG: Internet Engineering Steering Group (see [RFC2026], [RFC3710]).
IETF: Internet Engineering Task Force (see [RFC3233]). IETF: Internet Engineering Task Force (see [RFC3233]).
ISOC: Internet Society (see [RFC2031] and [ISOC]). ISOC: Internet Society (see [RFC2031] and [ISOC]).
2.2 Principles of the IASA, IETF and ISOC relationship 2.2 Principles of the IASA, IETF and ISOC relationship
This section attempts to describe principles underlying the This section attempts to describe principles underlying the
mechanisms described in this document. mechanisms described in this document.
1. The IETF intends to establish a structure (the IASA) in order to 1. The IETF intends to establish a structure (the IASA) in order to
get IETF administrative functions managed appropriately, get IETF administrative functions managed appropriately,
according to good administrative, fiscal, and management according to good administrative, fiscal, and management
principles. The IASA includes the IAD and the IAOC, and shall be principles. The IASA includes the IAD and the IAOC, and shall be
housed within ISOC. housed within ISOC.
2. The IAD and IAOC shall not have any authority over the IETF 2. The IAD and IAOC shall not have any authority over the IETF
standards development activities. This document does not modify standards development activities. This document does not modify
ISOC's other roles related to the IETF standard process. ISOC's other roles related to the IETF standard process.
3. The IAD and IAOC, in cooperation with the ISOC President/CEO and 3. The IAD and IAOC, in cooperation with the ISOC President/CEO and
staff, shall develop an annual budget for the IASA. The budget staff, shall develop an annual budget for the IASA. The budget
must clearly identify all expected direct and indirect must clearly identify all expected direct and indirect
expenditures related to the IASA. ISOC, through its normal expenditures related to the IASA. ISOC, through its normal
procedures, shall evaluate and approve the IASA budget as part of procedures, shall evaluate and approve the IASA budget as part of
ISOC's own budget process and commit to ensuring funds to support ISOC's own budget process and commit to ensuring funds to support
the approved budget. the approved budget.
Austein & Wijnen Expires August 15, 2005 [Page 6] Austein & Wijnen Expires August 2, 2005 [Page 5]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
4. Responsibility for the evaluation, review and negotiation of 4. Responsibility for the evaluation, review and negotiation of
contracts and other IETF administrative and support agreements contracts and other IETF administrative and support agreements
and other expenditures of funds under the IASA shall rest with and other expenditures of funds under the IASA shall rest with
the IAD, operating in accordance with policies and procedures set the IAD, operating in accordance with policies and procedures set
by the IAOC and consistent with ISOC operating policies. by the IAOC and consistent with ISOC operating policies.
5. Once funds or in-kind donations have been credited to the IASA 5. Once funds or in-kind donations have been credited to the IASA
accounts, they shall be irrevocably allocated to the support of accounts, they shall be irrevocably allocated to the support of
the IETF. the IETF.
6. There shall be a detailed public accounting to separately 6. There shall be a detailed public accounting to separately
identify all funds available to and all expenditures relating to identify all funds available to and all expenditures relating to
the IETF and to the IASA, including any donations, of funds or the IETF and to the IASA, including any donations, of funds or
in-kind, received by ISOC for IETF-related activities. In-kind in-kind, received by ISOC for IETF-related activities. In-kind
donations shall only be accepted at the direction of the IAD and donations shall only be accepted at the direction of the IAD and
IAOC. IAOC.
7. As between, the IETF, IASA and ISOC, the IETF, through the IASA, 7. The IETF, through the IASA,
shall have a perpetual right to use, display, distribute, shall have a perpetual right to use, display, distribute,
reproduce, modify and create derivatives of all software and data reproduce, modify and create derivatives of all software and data
created in support of IETF activities. created in support of IETF activities.
8. The IASA, in cooperation with ISOC, shall use reasonable efforts 8. The IASA, in cooperation with ISOC, shall
to ensure that sufficient reserves exist to keep the IETF ensure that sufficient reserves exist to keep the IETF
operational in the case of unexpected events such as income operational in the case of unexpected events such as income
shortfalls. shortfalls.
The remainder of this document contains details based on the above The remainder of this document contains details based on the above
principles. principles.
2.3 Community Consensus and Grant of Authority 2.3 Community Consensus and Grant of Authority
The IETF is a consensus-based group, and authority to act on behalf The IETF is a consensus-based group, and authority to act on behalf
of the community requires a high degree of consensus and the of the community requires a high degree of consensus and the
continued consent of the community. After a careful process of continued consent of the community. After a careful process of
deliberation, a broad-based community consensus emerged to house the deliberation, a broad-based community consensus emerged to house the
IETF Administrative Support Activity (IASA) within the Internet IETF Administrative Support Activity (IASA) within the Internet
Society. This document reflects that consensus. Society. This document reflects that consensus.
2.4 Termination and Change 2.4 Termination and Change
Any change to this agreement shall require a similar level of Any change to this agreement shall require a similar level of
community consensus and deliberation and shall be reflected by a community consensus and deliberation and shall be reflected by a
subsequent Best Current Practice (BCP) document. subsequent Best Current Practice (BCP) document.
2.5 Effective Date for Commencement of IASA 2.5 Effective Date for Commencement of IASA
The procedures in this document shall become operational after this The procedures in this document shall become operational after this
Austein & Wijnen Expires August 15, 2005 [Page 7]
Internet-Draft Structure of IASA February 2005
document has been approved by the process defined in BCP 9 [RFC2026], document has been approved by the process defined in BCP 9 [RFC2026],
including its acceptance as an IETF process BCP by the ISOC Board of including its acceptance as an IETF process BCP by the ISOC Board of
Austein & Wijnen Expires August 2, 2005 [Page 6]
Internet-Draft Structure of IASA February 2005
Trustees, and the ISOC Board of Trustees has confirmed its acceptance Trustees, and the ISOC Board of Trustees has confirmed its acceptance
of ISOC's responsibilities under the terms herein described. of ISOC's responsibilities under the terms herein described.
3. Structure of the IASA 3. Structure of the IASA
The IASA structure is designed to ensure accountability and The IASA structure is designed to ensure accountability and
transparency of the IETF administrative and fiscal activities to the transparency of the IETF administrative and fiscal activities to the
IETF community. The IETF Administrative Oversight Committee (IAOC) IETF community. The IETF Administrative Oversight Committee (IAOC)
directs and oversees the IASA. The IAOC consists of volunteers, all directs and oversees the IASA. The IAOC consists of volunteers, all
chosen directly or indirectly by the IETF community, as well as chosen directly or indirectly by the IETF community, as well as
appropriate ex officio members from ISOC and IETF leadership. The appropriate ex officio members from ISOC and IETF leadership. The
IAOC shall be accountable to the IETF community for the IAOC shall be accountable to the IETF community for the
effectiveness, efficiency and transparency of the IASA. effectiveness, efficiency and transparency of the IASA.
The IASA consists initially of a single full-time ISOC employee, the The IASA consists initially of a single full-time ISOC employee, the
IETF Administrative Director (IAD), who is entitled to act on behalf IETF Administrative Director (IAD), who is entitled to act on behalf
of the IASA at the direction of the IAOC. The IAD is likely to draw of the IASA at the direction of the IAOC. The IAD is likely to draw
on financial, legal and administrative support furnished by ISOC on financial, legal and administrative support furnished by ISOC
support staff or consultants. Costs for ISOC support staff and support staff or consultants. Costs for ISOC support staff and
consultants are allocated based on actual expenses or on some other consultants are allocated based on actual expenses or on some other
allocation model determined by consultation between the IAOC and allocation model determined by consultation between the IAOC and
ISOC. ISOC.
Although the IAD is an ISOC employee, he or she works under the Although the IAD is an ISOC employee, he or she works under the
direction of the IAOC. A committee of the IAOC is responsible for direction of the IAOC. A committee of the IAOC is responsible for
hiring and firing of the IAD, for reviewing the performance and for hiring and firing of the IAD, for reviewing the performance and for
setting the compensation of the IAD. The members of this committee setting the compensation of the IAD. The members of this committee
are appointed by the IAOC, and consist at minimum of the ISOC are appointed by the IAOC, and consist at minimum of the ISOC
President, the IETF Chair, and one of the Nomcom-appointed IAOC President, the IETF Chair, and one of the Nomcom-appointed IAOC
members. members.
The IAOC determines what IETF administrative functions are to be The IAOC determines what IETF administrative functions are to be
performed, and how or where they should be performed (whether performed, and how or where they should be performed (whether
internally within the IASA or by outside organizations), so as to internally within the IASA or by outside organizations), so as to
maintain an optimal balance of functional performance and cost of maintain an optimal balance of functional performance and cost of
each such function. The IAOC should document all such decisions, and each such function. The IAOC should document all such decisions, and
the justification for them, for review by the community. Each the justification for them, for review by the community. Each
function should be reviewed on a regular basis, using the assumption function should be reviewed on a regular basis, using the assumption
that, absent such justification, the function is either unnecessary that, absent such justification, the function is either unnecessary
or, if necessary, it is overstaffed, rather than using an assumption or, if necessary, it is overstaffed, rather than using an assumption
that anything which has been done in the past is still necessary; that anything which has been done in the past is still necessary;
each function should be adjusted as needed given the result of this each function should be adjusted as needed given the result of this
review. review.
The IAD is responsible for negotiating and maintaining contracts or The IAD is responsible for negotiating and maintaining contracts or
equivalent instruments with outside organizations, as well as equivalent instruments with outside organizations, as well as
Austein & Wijnen Expires August 15, 2005 [Page 8]
Internet-Draft Structure of IASA February 2005
providing any coordination necessary to make sure the IETF providing any coordination necessary to make sure the IETF
administrative support functions are covered properly. All administrative support functions are covered properly. All
Austein & Wijnen Expires August 2, 2005 [Page 7]
Internet-Draft Structure of IASA February 2005
functions, whether contracted to outside organizations or performed functions, whether contracted to outside organizations or performed
internally within the IASA, must be clearly specified and documented internally within the IASA, must be clearly specified and documented
with well-defined deliverables, service level agreements, and with well-defined deliverables, service level agreements, and
transparent accounting for the cost of such functions. transparent accounting for the cost of such functions.
The IASA is responsible for managing all intellectual property rights The IASA is responsible for managing all intellectual property rights
(IPR), including but not limited to trademarks, and copyrights, that (IPR), including but not limited to trademarks, and copyrights, that
belong to the IETF. The IASA is also be responsible for managing the belong to the IETF. The IASA is also be responsible for managing the
ownership, registration and administration of relevant domain names. ownership, registration and administration of relevant domain names.
The IASA is responsible for undertaking any and all required actions The IASA is responsible for undertaking any and all required actions
on behalf of the IETF to obtain, protect and manage the rights that on behalf of the IETF to obtain, protect and manage the rights that
the IETF needs to carry out its work. the IETF needs to carry out its work.
If the IASA cannot comply with the procedures described in this If the IASA cannot comply with the procedures described in this
document for legal, accounting or practical reasons, the IAOC shall document for legal, accounting or practical reasons, the IAOC shall
report that fact to the community, along with the variant procedure report that fact to the community, along with the variant procedure
the IAOC intends to follow. If the problem is a long-term one, the the IAOC intends to follow. If the problem is a long-term one, the
IAOC shall ask the IETF to update this document to reflect the IAOC shall ask the IETF to update this document to reflect the
changed procedure. changed procedure.
3.1 IAD Responsibilities 3.1 IAD Responsibilities
The IAD is responsible for working with the IAOC and others to The IAD is responsible for working with the IAOC and others to
understand the administrative requirements of the IETF, and for understand the administrative requirements of the IETF, and for
managing the IASA to meet those needs. This includes determining the managing the IASA to meet those needs. This includes determining the
structure of the IASA effort, establishing an operating budget, structure of the IASA effort, establishing an operating budget,
negotiating contracts with service providers, managing the business negotiating contracts with service providers, managing the business
relationship with those providers, and establishing mechanisms to relationship with those providers, and establishing mechanisms to
track their performance. The IAD may also manage other contractors track their performance. The IAD may also manage other contractors
or ISOC employees (such as support staff) as necessary, when such or ISOC employees (such as support staff) as necessary, when such
contractors or employees are engaged in IASA-related work. contractors or employees are engaged in IASA-related work.
The IAD is responsible for running IASA in an open and transparent The IAD is responsible for running IASA in an open and transparent
manner, and for producing regular monthly, quarterly, and annual manner, and for producing regular monthly, quarterly, and annual
financial and operational updates for IAOC and IETF community review. financial and operational updates for IAOC and IETF community review.
The IAD is responsible for administering the IETF finances, managing The IAD is responsible for administering the IETF finances, managing
separate financial accounts for the IASA, and establishing and separate financial accounts for the IASA, and establishing and
administering the IASA budget. administering the IASA budget. While ISOC will need to put some
The IAD (with IAOC approval, as financial controls in place to protect ISOC's fiscal stability, the IAD (with IAOC approval, as
appropriate) should have signing authority consistent with carrying appropriate) should have signing authority consistent with carrying
out IASA work effectively, efficiently and independently, taking into out IASA work effectively, efficiently and independently.
account ISOC's financial and approval controls. If there are any If there are any
problems regarding the level of financial approval granted to the problems regarding the level of financial approval granted to the
IAD, the IAOC and ISOC shall work out a policy that is mutually IAD, the IAOC and ISOC shall work out a policy that is mutually
agreeable, and shall do so within a reasonable timeframe. agreeable, and shall do so within a reasonable timeframe.
The IAD negotiates service contracts, with input, as appropriate,
Austein & Wijnen Expires August 15, 2005 [Page 9] Austein & Wijnen Expires August 2, 2005 [Page 8]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
The IAD negotiates service contracts, with input, as appropriate,
from other bodies, including legal advice, and with review, as from other bodies, including legal advice, and with review, as
appropriate, by the IAOC. The IAOC should establish guidelines for appropriate, by the IAOC. The IAOC should establish guidelines for
what level of review is expected based on contract type, size, cost, what level of review is expected based on contract type, size, cost,
or duration. ISOC executes contracts on behalf of the IASA, after or duration. ISOC executes contracts on behalf of the IASA, after
whatever review ISOC requires to ensure that the contracts meet whatever review ISOC requires to ensure that the contracts meet
ISOC's legal and financial ISOC's legal and financial requirements.
guidelines. If a contract
The IAD shall ensure that contracts entered into by ISOC on behalf of entered into by ISOC on behalf of
IASA and/or the IETF (an "IASA Contract") that provide for the IASA and/or the IETF (an "IASA Contract") provides for the
creation, development, modification or storage of any data creation, development, modification or storage of any data
(including, without limitation, any data relating to IETF membership, (including, without limitation, any data relating to IETF membership,
documents, archives, mailing lists, correspondence, financial documents, archives, mailing lists, correspondence, financial
records, personnel records and the like) ("Data"), grant to ISOC the records, personnel records and the like) ("Data"), then the IAD shall ensure that such contract grants to ISOC the
perpetual, irrevocable right, on behalf of IASA and IETF, to use, perpetual, irrevocable right, on behalf of IASA and IETF, to use,
display, distribute, reproduce, modify and create derivatives of such display, distribute, reproduce, modify and create derivatives of such
Data. ISOC will permit IASA and its designee(s) to have sole control Data. ISOC will permit IASA and its designee(s) to have sole control
and custodianship of such Data, and ISOC will not utilize or access and custodianship of such Data, and ISOC will not utilize or access
such Data in connection with any ISOC function other than IETF such Data in connection with any ISOC function other than IETF
without the written consent of the IAD. without the written consent of the IAD.
The IAD shall ensure that personal data collected for legitimate The IAD shall ensure that personal data collected for legitimate
purposes of the IASA are protected appropriately; at minimum, such purposes of the IASA are protected appropriately; at minimum, such
data must be protected to a degree consistent with relevant data must be protected to a degree consistent with relevant
legislation.
legislation and applicable privacy policies.
If an IASA Contract provides for the creation, development or If an IASA Contract provides for the creation, development or
modification of any software (including, without limitation, any modification of any software (including, without limitation, any
search tools, indexing tools and the like) ("Developed Software") search tools, indexing tools and the like) ("Developed Software")
then the IAD shall, whenever reasonable and practical, ensure that then the IAD shall, whenever reasonable and practical, ensure that
such contract either (a) grants ownership of such Developed Software such contract either (a) grants ownership of such Developed Software
to ISOC, or (b) grants ISOC a perpetual, irrevocable right, on behalf to ISOC, or (b) grants ISOC a perpetual, irrevocable right, on behalf
of IASA and IETF, to use, display, distribute, reproduce, modify and of IASA and IETF, to use, display, distribute, reproduce, modify and
create derivatives of such Software (including, without limitation, create derivatives of such Software (including, without limitation,
pursuant to an open source style license). It is preferred that pursuant to an open source style license). It is preferred that
Developed Software be provided and licensed for IASA and IETF use in Developed Software be provided and licensed for IASA and IETF use in
source code form, with no ongoing payments. ISOC will permit IASA source code form. ISOC will permit IASA
and its designee(s) to have sole control and custodianship of such and its designee(s) to have sole control and custodianship of such
Developed Software. The foregoing rights are not required in the Developed Software. The foregoing rights are not required in the
case of off-the-shelf or other commercially-available software that case of off-the-shelf or other commercially-available software that
is not developed at the expense of ISOC. is not developed at the expense of ISOC.
If an IASA Contract relates to the licensing of third party software, If an IASA Contract relates to the licensing of third party software,
the IAD shall ensure that such license expressly permits use of such the IAD shall ensure that such license expressly permits use of such
software for and on behalf of IASA and/or IETF, as applicable, and software for and on behalf of IASA and/or IETF, as applicable, and
that such license is transferable in accordance with the provisions that such license is transferable in accordance with the provisions
of Section 7 (Removability). of Section 7 (Removability).
The IAD and IAOC are responsible for making all business decisions
Austein & Wijnen Expires August 15, 2005 [Page 10] Austein & Wijnen Expires August 2, 2005 [Page 9]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
Notwithstanding the foregoing, the IAD can enter into different terms
if doing so is in the best interest of the IETF and upon approval of
the IAOC.
The IAD and IAOC are responsible for making all business decisions
regarding the IASA. In particular, the ISOC Board of Trustees shall regarding the IASA. In particular, the ISOC Board of Trustees shall
not have direct influence over the choice of IASA contractors or IETF not have direct influence over the choice of IASA contractors or IETF
meeting sponsors. This restriction is meant to enforce the meeting sponsors. This restriction is meant to enforce the
separation between fund raising and the actual operation of the separation between fund raising and the actual operation of the
standards process. standards process.
The IAD prepares an annual budget, which is subject to review and The IAD prepares an annual budget, which is subject to review and
approval by the IAOC. The IAD is responsible for presenting this approval by the IAOC. The IAD is responsible for presenting this
budget to the ISOC Board of Trustees, as part of ISOC's annual budget to the ISOC Board of Trustees, as part of ISOC's annual
financial planning process. As described elsewhere in this document, financial planning process. As described elsewhere in this document,
the IAOC is responsible for ensuring the budget's suitability for the IAOC is responsible for ensuring the budget's suitability for
meeting the IETF community's administrative needs, but the IAOC does meeting the IETF community's administrative needs, but the IAOC does
not bear fiduciary responsibility for ISOC. The ISOC Board of not bear fiduciary responsibility for ISOC. The ISOC Board of
Trustees therefore needs to review and understand the budget and Trustees therefore needs to review and understand the budget and
planned activity in enough detail to carry out their fiduciary planned activity in enough detail to carry out their fiduciary
responsibility properly. The IAD is responsible for managing this responsibility properly. The IAD is responsible for managing this
process of review and approval. The IAD sees to it that the IASA process of review and approval. The IAD sees to it that the IASA
publishes its complete approved budget to the IETF community each publishes its complete approved budget to the IETF community each
year. year.
3.2 IAOC Responsibilities 3.2 IAOC Responsibilities
The IAOC's role is to provide appropriate direction to the IAD, to The IAOC's role is to provide appropriate direction to the IAD, to
review the IAD's regular reports, and to oversee the IASA functions review the IAD's regular reports, and to oversee the IASA functions
to ensure that the administrative needs of the IETF community are to ensure that the administrative needs of the IETF community are
being properly met. The IAOC's mission is not to be engaged in the being properly met. The IAOC's mission is not to be engaged in the
day-to-day administrative work of IASA, but rather to provide day-to-day administrative work of IASA, but rather to provide
appropriate direction, oversight and approval. appropriate direction, oversight and approval.
Therefore, the IAOC's responsibilities are: Therefore, the IAOC's responsibilities are:
o To select the IAD and provide high-level review and direction for o To select the IAD and provide high-level review and direction for
his or her work. This task should be handled by a sub-committee, his or her work. This task should be handled by a sub-committee,
as described above. as described above.
o To review the IAD's plans and contracts to ensure that they will o To review the IAD's plans and contracts to ensure that they will
meet the administrative needs of the IETF. meet the administrative needs of the IETF.
o To track whether the IASA functions are meeting the IETF o To track whether the IASA functions are meeting the IETF
community's administrative needs, and to work with the IAD to community's administrative needs, and to work with the IAD to
determine a plan for corrective action if they are not. determine a plan for corrective action if they are not.
o To review the IAD's budget proposals to ensure that they will meet o To review the IAD's budget proposals to ensure that they will meet
Austein & Wijnen Expires August 15, 2005 [Page 11]
Internet-Draft Structure of IASA February 2005
the IETF's needs, and review the IAD's regular financial reports. the IETF's needs, and review the IAD's regular financial reports.
o To ensure that the IASA is run in a transparent and accountable o To ensure that the IASA is run in a transparent and accountable
manner. While the day-to-day work should be delegated to the IAD manner. While the day-to-day work should be delegated to the IAD
and others, the IAOC is responsible for ensuring that IASA and others, the IAOC is responsible for ensuring that IASA
Austein & Wijnen Expires August 2, 2005 [Page 10]
Internet-Draft Structure of IASA February 2005
finances and operational status are tracked appropriately, and finances and operational status are tracked appropriately, and
that monthly, quarterly, and annual financial and operational that monthly, quarterly, and annual financial and operational
reports are published to the IETF community. reports are published to the IETF community.
o To designate, in consultation with the IAB and the IESG, the o To designate, in consultation with the IAB and the IESG, the
person or people who carry out the tasks which other IETF process person or people who carry out the tasks which other IETF process
documents say are carried out by the IETF Executive Director. documents say are carried out by the IETF Executive Director.
The IAOC's role is to direct and review, not perform, the work of the The IAOC's role is to direct and review, not perform, the work of the
IAD and IASA. The IAOC holds periodic teleconferences and IAD and IASA. The IAOC holds periodic teleconferences and
face-to-face meetings as needed to carry out the IAOC's duties face-to-face meetings as needed to carry out the IAOC's duties
efficiently and effectively. efficiently and effectively.
If there is no IAD or the IAD is unavailable, the IAOC may If there is no IAD or the IAD is unavailable, the IAOC may
temporarily assign the IAD's duties to individual members of the temporarily assign the IAD's duties to individual members of the
IAOC. IAOC.
3.3 Relationship of the IAOC to Existing IETF Leadership 3.3 Relationship of the IAOC to Existing IETF Leadership
The IAOC is directly accountable to the IETF community for the The IAOC is directly accountable to the IETF community for the
performance of the IASA. However, the nature of the IAOC's work performance of the IASA. However, the nature of the IAOC's work
involves treating the IESG and IAB as major internal customers of the involves treating the IESG and IAB as major internal customers of the
administrative support services. The IAOC and the IAD should not administrative support services. The IAOC and the IAD should not
consider their work successful unless the IESG and IAB are also consider their work successful unless the IESG and IAB are also
satisfied with the administrative support that the IETF is receiving. satisfied with the administrative support that the IETF is receiving.
3.4 IAOC Decision Making 3.4 IAOC Decision Making
The IAOC attempts to reach consensus on all decisions. If the IAOC The IAOC attempts to reach consensus on all decisions. If the IAOC
cannot achieve a consensus decision, then the IAOC may decide by cannot achieve a consensus decision, then the IAOC may decide by
voting. voting.
The IAOC decides the details about its decision-making rules, The IAOC decides the details about its decision-making rules,
including its rules for quorum, conflict of interest and breaking of including its rules for quorum, conflict of interest and breaking of
ties. These rules shall be made public. ties. These rules shall be made public.
All IAOC decisions shall be recorded in IAOC minutes, and IAOC All IAOC decisions shall be recorded in IAOC minutes, and IAOC
minutes shall be published in a timely fashion. minutes shall be published in a timely fashion.
3.5 Review and Appeal of IAD and IAOC Decision 3.5 Review and Appeal of IAD and IAOC Decision
The IAOC is directly accountable to the IETF community for the The IAOC is directly accountable to the IETF community for the
performance of the IASA. In order to achieve this, the IAOC and IAD performance of the IASA. In order to achieve this, the IAOC and IAD
Austein & Wijnen Expires August 15, 2005 [Page 12]
Internet-Draft Structure of IASA February 2005
will ensure that guidelines are developed for regular operational will ensure that guidelines are developed for regular operational
decision making. Where appropriate, these guidelines should be decision making. Where appropriate, these guidelines should be
developed with public input. In all cases, they must be made public. developed with public input. In all cases, they must be made public.
If a member of the IETF community questions whether a decision or If a member of the IETF community questions whether a decision or
Austein & Wijnen Expires August 2, 2005 [Page 11]
Internet-Draft Structure of IASA February 2005
action of the IAD or the IAOC has been undertaken in accordance with action of the IAD or the IAOC has been undertaken in accordance with
IETF BCPs or IASA operational guidelines, or questions whether the IETF BCPs or IASA operational guidelines, or questions whether the
IASA has created and maintained appropriate guidelines, he or she may IASA has created and maintained appropriate guidelines, he or she may
ask the IAOC for a formal review of the decision or action. ask the IAOC for a formal review of the decision or action.
The request for review should be addressed to the IAOC chair and The request for review should be addressed to the IAOC chair and
should include a description of the decision or action to be should include a description of the decision or action to be
reviewed, an explanation of how, in the requestor's opinion, the reviewed, an explanation of how, in the requestor's opinion, the
decision or action violates the BCPs or operational guidelines, and a decision or action violates the BCPs or operational guidelines, and a
suggestion for how the situation could be rectified. All requests suggestion for how the situation could be rectified. All requests
for review shall be posted publicly, and the IAOC is expected to for review shall be posted publicly, and the IAOC is expected to
respond to these requests within a reasonable period, typically respond to these requests within a reasonable period, typically
within 90 days. It is up to the IAOC to determine what type of within 90 days. It is up to the IAOC to determine what type of
review and response is required, based on the nature of the review review and response is required, based on the nature of the review
request. Based on the results of the review, the IAOC may choose to request. Based on the results of the review, the IAOC may choose to
overturn their own decision, change their operational guidelines to overturn their own decision, change their operational guidelines to
prevent further misunderstandings, take other action as appropriate, prevent further misunderstandings, take other action as appropriate,
or just publish the review result and take no other action. or just publish the review result and take no other action.
If a member of the community is not satisfied with the IAOC's If a member of the community is not satisfied with the IAOC's
response to his or her review request, he or she may escalate the response to his or her review request, he or she may escalate the
issue by appealing the decision or action to the IAB, using the issue by appealing the decision or action to the IAB, using the
appeals procedures outlined in RFC 2026 [RFC2026]. If he or she is appeals procedures outlined in RFC 2026 [RFC2026]. If he or she is
not satisfied with the IAB response, he or she can escalate the issue not satisfied with the IAB response, he or she can escalate the issue
to the ISOC Board of Trustees, as described in RFC 2026. to the ISOC Board of Trustees, as described in RFC 2026.
The reviewing body (IAB or ISOC Board of Trustees) shall review the The reviewing body (IAB or ISOC Board of Trustees) shall review the
decision of the IAD or IAOC to determine whether it was made in decision of the IAD or IAOC to determine whether it was made in
accordance with existing BCPs and operational guidelines. As a accordance with existing BCPs and operational guidelines. As a
result of this review, the reviewing body may recommend to the result of this review, the reviewing body may recommend to the
community that the BCPs governing IAOC actions should be changed. community that the BCPs governing IAOC actions should be changed.
The reviewing body may also advise the IAOC to modify existing The reviewing body may also advise the IAOC to modify existing
operational guidelines to avoid similar issues in the future and/or operational guidelines to avoid similar issues in the future and/or
may advise the IAOC to re-consider their decision or action. It may may advise the IAOC to re-consider their decision or action. It may
also recommend that no action be taken based on the review. also recommend that no action be taken based on the review.
In exceptional cases, when no other recourse seems reasonable, the In exceptional cases, when no other recourse seems reasonable, the
reviewing body may overturn or reverse a non-binding decision or reviewing body may overturn or reverse a non-binding decision or
action of the IAOC. This should be done only after careful action of the IAOC. This should be done only after careful
consideration and consultation with the IAOC regarding the consideration and consultation with the IAOC regarding the
ramifications of this action. In no circumstances may the IAB or ramifications of this action. In no circumstances may the IAB or
ISOC Board of Trustees overturn a decision of the IAOC that involves ISOC Board of Trustees overturn a decision of the IAOC that involves
a binding contract or overturn a personnel-related action (such as a binding contract or overturn a personnel-related action (such as
hiring, firing, promotion, demotion, performance reviews, salary
adjustments, etc.).
Austein & Wijnen Expires August 15, 2005 [Page 13] Austein & Wijnen Expires August 2, 2005 [Page 12]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
hiring, firing, promotion, demotion, performance reviews, salary
adjustments, etc.).
4. IAOC Membership, Selection and Accountability 4. IAOC Membership, Selection and Accountability
The IAOC shall consist of eight voting members who shall be selected The IAOC shall consist of eight voting members who shall be selected
as follows: as follows:
o 2 members appointed by the IETF Nominations Committee (NomCom); o 2 members appointed by the IETF Nominations Committee (NomCom);
o 1 member appointed by the IESG; o 1 member appointed by the IESG;
o 1 member appointed by the IAB; o 1 member appointed by the IAB;
o 1 member appointed by the ISOC Board of Trustees; o 1 member appointed by the ISOC Board of Trustees;
o The IETF Chair (ex officio); o The IETF Chair (ex officio);
o The IAB Chair (ex officio); o The IAB Chair (ex officio);
o The ISOC President/CEO (ex officio). o The ISOC President/CEO (ex officio).
The IETF Administrative Director also serves, ex officio, as a The IETF Administrative Director also serves, ex officio, as a
non-voting member of the IAOC. non-voting member of the IAOC.
The IAOC may also choose to invite liaisons from other groups, but is The IAOC may also choose to invite liaisons from other groups, but is
not required to do so; the IAOC decides whether or not to have a not required to do so; the IAOC decides whether or not to have a
liaison to any particular group. Any such liaisons are non-voting. liaison to any particular group. Any such liaisons are non-voting.
Responsibility for selecting the individual filling a particular Responsibility for selecting the individual filling a particular
liaison role lies with the body from which the IAOC has requested the liaison role lies with the body from which the IAOC has requested the
liaison. liaison.
Subject to paragraph 2 of Section 4.1, appointed members of the IAOC Subject to paragraph 2 of Section 4.1, appointed members of the IAOC
serve two year terms. IAOC terms normally end at the end of the serve two year terms. IAOC terms normally end at the end of the
first IETF meeting of a year. first IETF meeting of a year.
The members of the IAOC shall select one of its appointed voting The members of the IAOC shall select one of its appointed voting
members to serve as the chair of the IAOC. The term of the IAOC members to serve as the chair of the IAOC. The term of the IAOC
chair shall be one year from the time of selection or the remaining chair shall be one year from the time of selection or the remaining
time of his or her tenure on the IAOC, whichever is less. An time of his or her tenure on the IAOC, whichever is less. An
individual may serve any number of terms as chair, if selected by the individual may serve any number of terms as chair, if selected by the
IAOC. IAOC.
The Chair serves at the pleasure of the IAOC, and may be removed from The Chair serves at the pleasure of the IAOC, and may be removed from
that position at any time by a vote of 2/3 of the voting IAOC that position at any time by a vote of 2/3 of the voting IAOC
members, not counting the IAOC chair. members, not counting the IAOC chair.
The chair of the IAOC shall have the authority to manage the The chair of the IAOC shall have the authority to manage the
Austein & Wijnen Expires August 15, 2005 [Page 14]
Internet-Draft Structure of IASA February 2005
activities and meetings of the IAOC. activities and meetings of the IAOC.
The two NomCom-appointed IAOC members are chosen using the procedures The two NomCom-appointed IAOC members are chosen using the procedures
Austein & Wijnen Expires August 2, 2005 [Page 13]
Internet-Draft Structure of IASA February 2005
described in RFC 3777 [RFC3777]. For the initial IAOC selection, the described in RFC 3777 [RFC3777]. For the initial IAOC selection, the
IESG will provide the list of desired qualifications for these IESG will provide the list of desired qualifications for these
positions; in later years, the IAOC will provide this qualification positions; in later years, the IAOC will provide this qualification
list. The IESG will serve as the confirming body for IAOC list. The IESG will serve as the confirming body for IAOC
appointments by the NomCom. appointments by the NomCom.
While there are no hard rules regarding how the IAB and the IESG While there are no hard rules regarding how the IAB and the IESG
should select members of the IAOC, such appointees need not be should select members of the IAOC, such appointees need not be
current IAB or IESG members (and probably should not be, if only to current IAB or IESG members (and probably should not be, if only to
avoid overloading the existing leadership). The IAB and IESG should avoid overloading the existing leadership). The IAB and IESG should
choose people with some knowledge of contracts and financial choose people with some knowledge of contracts and financial
procedures, who are familiar with the administrative support needs of procedures, who are familiar with the administrative support needs of
the IAB, the IESG, or the IETF standards process. The IAB and IESG the IAB, the IESG, or the IETF standards process. The IAB and IESG
should follow a fairly open process for these selections, perhaps should follow a fairly open process for these selections, perhaps
with an open call for nominations or a period of public comment on with an open call for nominations or a period of public comment on
the candidates. The procedure for IAB selection of ISOC Board of the candidates. The procedure for IAB selection of ISOC Board of
Trustees [RFC3677] might be a good model for how this could work. Trustees [RFC3677] might be a good model for how this could work.
After the IETF gains some experience with IAOC selection, these After the IETF gains some experience with IAOC selection, these
selection mechanisms should be documented more formally. selection mechanisms should be documented more formally.
Although the IAB, the IESG and the ISOC Board of Trustees choose some Although the IAB, the IESG and the ISOC Board of Trustees choose some
members of the IAOC, those members do not directly represent the members of the IAOC, those members do not directly represent the
bodies that chose them. All members of the IAOC are accountable bodies that chose them. All members of the IAOC are accountable
directly to the IETF community. To receive direct feedback from the directly to the IETF community. To receive direct feedback from the
community, the IAOC holds an open meeting at least once per year at community, the IAOC holds an open meeting at least once per year at
an IETF meeting. This may take the form of an open IAOC plenary or a an IETF meeting. This may take the form of an open IAOC plenary or a
working meeting held during an IETF meeting slot. The form and working meeting held during an IETF meeting slot. The form and
contents of this meeting are left to the discretion of the IAOC contents of this meeting are left to the discretion of the IAOC
Chair. The IAOC should also consider open mailing lists or other Chair. The IAOC should also consider open mailing lists or other
means to establish open communication with the community. means to establish open communication with the community.
IAOC members are subject to recall in the event that an IAOC member IAOC members are subject to recall in the event that an IAOC member
abrogates his or her duties or acts against the best interests of the abrogates his or her duties or acts against the best interests of the
IETF community. Any appointed IAOC member, including those appointed IETF community. Any appointed IAOC member, including those appointed
by the IAB, IESG or ISOC Board of Trustees, may be recalled using the by the IAB, IESG or ISOC Board of Trustees, may be recalled using the
recall procedure defined in RFC 3777 [RFC3777]. IAOC members are recall procedure defined in RFC 3777 [RFC3777]. IAOC members are
not, however, subject to recall by the bodies that appointed them. not, however, subject to recall by the bodies that appointed them.
If a vacancy occurs among the appointed members, this is filled by If a vacancy occurs among the appointed members, this is filled by
the appointing body for that position according to its procedures. the appointing body for that position according to its procedures.
The IAOC members shall not receive any compensation from the IASA, The IAOC members shall not receive any compensation from the IASA,
ISOC or IETF for their services as members of the IAOC. ISOC or IETF for their services as members of the IAOC.
The IAOC shall set and publish rules covering reimbursement of The IAOC shall set and publish rules covering reimbursement of
expenses, and such reimbursement shall generally be for exceptional
cases only.
Austein & Wijnen Expires August 15, 2005 [Page 15] Austein & Wijnen Expires August 2, 2005 [Page 14]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
expenses, and such reimbursement shall generally be for exceptional
cases only.
4.1 Initial IAOC Selection 4.1 Initial IAOC Selection
The initial IAOC selection will start after this document is approved The initial IAOC selection will start after this document is approved
as a BCP by the IESG and accepted by the ISOC Board of Trustees. The as a BCP by the IESG and accepted by the ISOC Board of Trustees. The
IESG, IAB, and ISOC Board of Trustees should make their selections IESG, IAB, and ISOC Board of Trustees should make their selections
within 45-days of BCP approval, and the NomCom should make their within 45-days of BCP approval, and the NomCom should make their
selections as quickly as possible while complying with the documented selections as quickly as possible while complying with the documented
NomCom procedures. The IAOC will become active as soon as a majority NomCom procedures. The IAOC will become active as soon as a majority
(three or more) of the appointed members have been selected. (three or more) of the appointed members have been selected.
Initially, the IESG and the ISOC Board of Trustees will make one-year Initially, the IESG and the ISOC Board of Trustees will make one-year
appointments, the IAB will make a two-year appointment, and the appointments, the IAB will make a two-year appointment, and the
NomCom will make one one-year appointment and one two-year NomCom will make one one-year appointment and one two-year
appointment. This will establish a pattern in which approximately appointment. This will establish a pattern in which approximately
half of the IAOC is selected each year. half of the IAOC is selected each year.
5. IASA Funding 5. IASA Funding
The IASA manages money from three sources: The IASA manages money from three sources:
1. IETF meeting revenues; 1. IETF meeting revenues;
2. Designated donations to ISOC (both monetary and in-kind); 2. Designated donations to ISOC (both monetary and in-kind);
3. Other ISOC support. 3. Other ISOC support.
Note that the goal is to achieve and maintain a viable IETF support Note that the goal is to achieve and maintain a viable IETF support
function based on available funding sources. The IETF community function based on available funding sources. The IETF community
expects the IAOC and ISOC to work together to attain that expects the IAOC and ISOC to work together to attain that goal, and
recognizes that doing so will require striking some sort of balance.
For example, dropping the meeting fees to $0 and expecting ISOC to
goal. pick up
5.1 Cost Center Accounting
Funds managed by the IASA shall be the slack would not be viable in the long term, and neither
would be raising the meeting fees to prohibitive levels in order to
fund all non-meeting-related activities.
5.1 Cost Center Accounting
accounted for in a separate set of Funds managed by the IASA shall be accounted for in a separate set of
general ledger accounts within the IASA Cost Center. In the general ledger accounts within the IASA Cost Center. In the
remainder of this document, these general ledger accounts are termed remainder of this document, these general ledger accounts are termed
"IASA accounts". A periodic summary of the IASA accounts shall be "IASA accounts". A periodic summary of the IASA accounts shall be
reported in the form of standard financial statements that reflect reported in the form of standard financial statements that reflect
the income, expenses, assets, and liabilities of the IASA. the income, expenses, assets, and liabilities of the IASA.
The IAOC and ISOC shall agree upon and publish procedures for The IAOC and ISOC shall agree upon and publish procedures for
reporting and auditing of these accounts. reporting and auditing of these accounts.
Note that ISOC in consultation with the IAOC can decide to structure Note that ISOC in consultation with the IAOC can decide to structure
Austein & Wijnen Expires August 2, 2005 [Page 15]
Internet-Draft Structure of IASA February 2005
the IASA accounting differently in the future within the constraints the IASA accounting differently in the future within the constraints
outlined in Section 7. outlined in Section 7.
Austein & Wijnen Expires August 15, 2005 [Page 16]
Internet-Draft Structure of IASA February 2005
5.2 IETF Meeting Revenues 5.2 IETF Meeting Revenues
Meeting revenues are an important source of funds for IETF functions. Meeting revenues are an important source of funds for IETF functions.
The IAD, in consultation with the IAOC, sets the meeting fees as part The IAD, in consultation with the IAOC, sets the meeting fees as part
of the budgeting process. All meeting revenues shall be credited to of the budgeting process. All meeting revenues shall be credited to
the appropriate IASA accounts. the appropriate IASA accounts.
5.3 Designated Donations, Monetary and In-Kind 5.3 Designated Donations, Monetary and In-Kind
Donations are an essential component of funding. The IASA undertakes Donations are an essential component of funding. The IASA undertakes
no direct fund-raising activities. This establishes a practice of no direct fund-raising activities. This establishes a practice of
separating IETF administrative and standards activities from separating IETF administrative and standards activities from
fund-raising activities, and helps ensure that no undue influence may fund-raising activities, and helps ensure that no undue influence may
be ascribed to those from whom funds are raised. be ascribed to those from whom funds are raised.
ISOC shall create and maintain appropriate structures and programs to ISOC shall create and maintain appropriate structures and programs to
coordinate donations intended to support the work of the IETF, and coordinate donations intended to support the work of the IETF, and
these shall include mechanisms for both in-kind and direct these shall include mechanisms for both in-kind and direct
contributions to the work supported by IASA. Since ISOC will be the contributions to the work supported by IASA. Since ISOC will be the
sole entity through whom donations may be made to the work of the sole entity through whom donations may be made to the work of the
IETF, ISOC shall ensure that those programs are not unduly IETF, ISOC shall ensure that those programs are not unduly
restrictive. ISOC shall maintain programs that allow for designated restrictive. ISOC shall maintain programs that allow for designated
donations to the IETF. donations to the IETF.
In-kind resources are owned by the ISOC on behalf of the IETF and In-kind resources are owned by the ISOC on behalf of the IETF and
shall be reported and accounted for in a manner that identifies them shall be reported and accounted for in a manner that identifies them
as such. Designated monetary donations shall be credited to the as such. Designated monetary donations shall be credited to the
appropriate IASA accounts. appropriate IASA accounts.
5.4 Other ISOC Support 5.4 Other ISOC Support
Other ISOC support shall be based on the budget process as specified Other ISOC support shall be based on the budget process as specified
in Section 6, which includes deciding when ISOC monetary support is in Section 6, which includes deciding when ISOC monetary support is
to be credited to the IASA accounts. to be credited to the IASA accounts.
All ISOC support, no matter how it is delivered, shall be reported in All ISOC support, no matter how it is delivered, shall be reported in
the IASA financial reports. the IASA financial reports.
5.5 IASA Expenses 5.5 IASA Expenses
The IASA exists to support the IETF. Funds designated for IASA shall The IASA exists to support the IETF. Funds in IASA accounts shall
be used solely to support IETF activities and for no other purposes. be used solely to support IETF activities and for no other purposes.
Austein & Wijnen Expires August 2, 2005 [Page 16]
Internet-Draft Structure of IASA February 2005
5.6 Operating Reserve 5.6 Operating Reserve
As an initial guideline and in normal operating circumstances, the As an initial guideline and in normal operating circumstances, the
IASA should have an operating reserve for its activities sufficient IASA should have an operating reserve for its activities sufficient
to cover 6-months of non-meeting operational expenses, plus twice the to cover 6-months of non-meeting operational expenses, plus twice the
Austein & Wijnen Expires August 15, 2005 [Page 17]
Internet-Draft Structure of IASA February 2005
recent average for meeting contract guarantees. The IASA, in recent average for meeting contract guarantees. The IASA, in
cooperation with ISOC, shall establish detailed targets for a reserve cooperation with ISOC, shall establish detailed targets for a reserve
fund to cover normal operating expenses and meeting expenses in fund to cover normal operating expenses and meeting expenses in
accordance with prudent planning, as part of the budget process. accordance with prudent planning, as part of the budget process.
The IASA expects ISOC to use reasonable efforts to build and provide The IASA expects ISOC to build and provide
that operational reserve, through whatever mechanisms ISOC deems that operational reserve, through whatever mechanisms ISOC deems
appropriate. appropriate.
If the IASA accounts accumulate a surplus, ISOC may count that as If the IASA accounts accumulate a surplus, ISOC may count that as
part of the reserve. part of the reserve.
6. IASA Budget Process 6. IASA Budget Process
While the IASA sets a budget for the IETF's administrative needs, its While the IASA sets a budget for the IETF's administrative needs, its
budget process clearly needs to be closely coordinated with ISOC's. budget process clearly needs to be closely coordinated with ISOC's.
The specific timeline shall be established each year by IASA and The specific timeline shall be established each year by IASA and
ISOC. As an example, a general annual timeline for budgeting is: ISOC. As an example, a general annual timeline for budgeting is:
July 1: The IAD presents a budget proposal (prepared in consultation July 1: The IAD presents a budget proposal (prepared in consultation
with ISOC staff) for the following fiscal year, with 3 year with ISOC staff) for the following fiscal year, with 3 year
projections, to the IAOC. projections, to the IAOC.
August 1: The IAOC approves the budget proposal for IETF purposes, August 1: The IAOC approves the budget proposal for IETF purposes,
after any appropriate revisions. As the ISOC President is part of after any appropriate revisions. As the ISOC President is part of
the IAOC, the IAOC should have a preliminary indication of how the the IAOC, the IAOC should have a preliminary indication of how the
budget will fit with ISOC's own budgetary expectations. The budget will fit with ISOC's own budgetary expectations. The
budget proposal is passed to the ISOC Board of Trustees for review budget proposal is passed to the ISOC Board of Trustees for review
in accordance with their fiduciary duty. in accordance with their fiduciary duty.
September 1: The ISOC Board of Trustees approves the budget proposal September 1: The ISOC Board of Trustees approves the budget proposal
provisionally. During the next 2 months, the budget may be provisionally. During the next 2 months, the budget may be
revised to be integrated in ISOC's overall budgeting process. revised to be integrated in ISOC's overall budgeting process.
November 1: Final budget to the ISOC Board for approval. November 1: Final budget to the ISOC Board for approval.
The dates described above are examples, and are subject to change. The dates described above are examples, and are subject to change.
They will most likely be modified each year based on the dates of the They will most likely be modified each year based on the dates of the
second and third IETF meetings of that year. They also need to be second and third IETF meetings of that year. They also need to be
synchronized with the ISOC budgeting process. synchronized with the ISOC budgeting process.
The IAD shall provide monthly accountings of expenses, and shall The IAD shall provide monthly accountings of expenses, and shall
update expenditures forecasts every quarter. This may require update expenditures forecasts every quarter. This may require
adjustment of the IASA budget: if so, the revised budget will need to adjustment of the IASA budget: if so, the revised budget will need to
Austein & Wijnen Expires August 2, 2005 [Page 17]
Internet-Draft Structure of IASA February 2005
be approved by the IAOC, the ISOC President/CEO and, if necessary, be approved by the IAOC, the ISOC President/CEO and, if necessary,
the ISOC Board of Trustees. the ISOC Board of Trustees.
Austein & Wijnen Expires August 15, 2005 [Page 18]
Internet-Draft Structure of IASA February 2005
7. ISOC Responsibilities for IASA 7. ISOC Responsibilities for IASA
Within ISOC, support for the IASA shall meet the following goals: Within ISOC, support for the IASA shall meet the following goals:
Transparency: The IETF community shall have complete visibility into Transparency: The IETF community shall have complete visibility into
the financial and legal structure of the ISOC activities that are the financial and legal structure of the ISOC activities that are
related to, but not part of, the IASA standards support activity. related to, but not part of, the IASA standards support activity.
In particular, a detailed budget for the entire related ISOC In particular, a detailed budget for the entire related ISOC
activity, quarterly financial reports, and audited annual activity, quarterly financial reports, and audited annual
financial reports shall all be available to the IETF community. financial reports shall all be available to the IETF community.
In addition, key contract material and MOUs shall also be publicly In addition, key contract material and MOUs shall also be publicly
available, subject to any reasonable confidentiality obligations available, subject to any reasonable confidentiality obligations
approved by the IAOC. approved by the IAOC.
Unification: As part of this arrangement, ISOC's sponsorship of the Unification: As part of this arrangement, ISOC's sponsorship of the
RFC Editor, IAB and IESG shall be managed as part of the IASA RFC Editor, IAB and IESG shall be managed as part of the IASA
under the IAOC. under the IAOC.
Independence: The IASA shall be distinct from other ISOC activities. Independence: The IASA shall be distinct from other ISOC activities.
ISOC shall support the IASA through the mechanisms specified in ISOC shall support the IASA through the mechanisms specified in
this document and its successors. this document and its successors.
Support: ISOC shall work with the IAD and IAOC to ensure appropriate Support: ISOC shall work with the IAD and IAOC to ensure appropriate
financial support for the IASA, following the mechanisms described financial support for the IASA, following the mechanisms described
in this document and its successors. in this document and its successors.
Removability: While there is no current plan to transfer the legal Removability: While there is no current plan to transfer the legal
and financial home of the IASA to another corporation, the IASA and financial home of the IASA to another corporation, the IASA
shall be structured to enable a clean transition in the event that shall be structured to enable a clean transition in the event that
the IETF community decides that such a transition is required and the IETF community decides that such a transition is required and
documents its consensus in a formal document (currently called a documents its consensus in a formal document (currently called a
BCP). In such a case, the IAOC shall give ISOC a minimum of six BCP). In such a case, the IAOC shall give ISOC a minimum of six
months notice before the transition formally occurs. During that months notice before the transition formally occurs. During that
period, the IETF and ISOC shall work together to create a smooth period, the IETF and ISOC shall work together to create a smooth
transition that does not result in any significant service outages transition that does not result in any significant service outages
or missed IETF meetings. All contracts executed by ISOC on behalf or missed IETF meetings. All contracts executed by ISOC on behalf
of IASA shall either include a clause allowing termination by ISOC of IASA shall either include a clause allowing termination by ISOC
with six months notice, or shall be transferable to another with six months notice, or shall be transferable to another
corporation in the event that the IASA transitions away from ISOC. corporation in the event that the IASA transitions away from ISOC.
To the extent allowed by law, any balance in the IASA accounts, To the extent allowed by law, any balance in the IASA accounts,
any IETF-specific intellectual property rights, and any any IETF-specific intellectual property rights, and any
IETF-specific data and tools shall also transition to the new IETF-specific data and tools shall also transition to the new
entity. Other terms shall be negotiated between the IETF and entity. Other terms shall be negotiated between the IETF and
ISOC. ISOC.
Austein & Wijnen Expires August 2, 2005 [Page 18]
Internet-Draft Structure of IASA February 2005
Within the constraints outlined above, all other details of how to Within the constraints outlined above, all other details of how to
structure this activity within ISOC (for instance as a cost center, a structure this activity within ISOC (whether as a cost center, a
department,
division, or an affiliate) shall be determined by ISOC in or a formal subsidiary) shall be determined by ISOC in
Austein & Wijnen Expires August 15, 2005 [Page 19]
Internet-Draft Structure of IASA February 2005
consultation with the IAOC. consultation with the IAOC.
8. Security Considerations 8. Security Considerations
This document describes the structure of the IETF's administrative This document describes the structure of the IETF's administrative
support activity. It introduces no security considerations for the support activity. It introduces no security considerations for the
Internet. Internet.
9. IANA Considerations 9. IANA Considerations
This document has no IANA considerations in the traditional sense. This document has no IANA considerations in the traditional sense.
However, some of the information in this document may affect how the However, some of the information in this document may affect how the
IETF standards process interfaces with IANA, so IANA may be IETF standards process interfaces with IANA, so IANA may be
interested in the contents. interested in the contents.
10. Acknowledgements 10. Acknowledgements
The editors would like to thank everyone who provided feedback on The editors would like to thank everyone who provided feedback on
this document or any of its predecessors back to the original this document or any of its predecessors back to the original
"Scenario O" e-mail message. In particular, the editors would like "Scenario O" e-mail message. In particular, the editors would like
to thank: Bernard Aboba, Jari Arkko, Fred Baker, Scott Bradner, Scott to thank: Bernard Aboba, Jari Arkko, Fred Baker, Scott Bradner, Scott
Brim, Brian Carpenter, Jorge Contreras, Dave Crocker, Elwyn Davies, Brim, Brian Carpenter, Jorge Contreras, Dave Crocker, Elwyn Davies,
Spencer Dawkins, Avri Doria, Tony Hain, Joel Halpern, Ted Hardie, Sam Spencer Dawkins, Avri Doria, Tony Hain, Joel Halpern, Ted Hardie, Sam
Hartman, Russel Housley, Geoff Huston, Jeff Hutzelman, John Klensin, Hartman, Russel Housley, Geoff Huston, Jeff Hutzelman, John Klensin,
Valdis Kletnieks, Eliot Lear, Henrik Levkowetz, Kurt Erik Lindqvist, Valdis Kletnieks, Eliot Lear, Henrik Levkowetz, Kurt Erik Lindqvist,
John Loughney. Carl Malamud, Allison Mankin, Tom Petch, Eric John Loughney. Carl Malamud, Allison Mankin, Tom Petch, Eric
Rescorla, Pete Resnick, Glenn Ricart, Jonne Soininen, Lynn St Amour, Rescorla, Pete Resnick, Glenn Ricart, Jonne Soininen, Lynn St Amour,
and Michael StJohns. and Michael StJohns.
Special thanks are due to Leslie Daigle and Margaret Wasserman, who Special thanks are due to Leslie Daigle and Margaret Wasserman, who
wrote the original "Scenario O" message and edited the earliest wrote the original "Scenario O" message and edited the earliest
versions of this document. versions of this document.
Special thanks are also due to Henrik Levkowetz for kindly Special thanks are also due to Henrik Levkowetz for kindly
volunteering to maintain the issue tracking system associated with volunteering to maintain the issue tracking system associated with
this document. this document.
Last, special thanks are due to Harald Alvestrand, for leading the Last, special thanks are due to Harald Alvestrand, for leading the
search for consensus on the IETF mailing list. search for consensus on the IETF mailing list.
No doubt the above list is incomplete. We apologize to anyone whom No doubt the above list is incomplete. We apologize to anyone whom
we left out. we left out.
This document was written using the xml2rfc tool described in RFC This document was written using the xml2rfc tool described in RFC
2629 [RFC2629]. 2629 [RFC2629].
Austein & Wijnen Expires August 15, 2005 [Page 20] Austein & Wijnen Expires August 2, 2005 [Page 19]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
11. References 11. References
11.1 Normative References 11.1 Normative References
[RFC2026] Bradner, S., "The Internet Standards Process -- Revision [RFC2026] Bradner, S., "The Internet Standards Process -- Revision
3", BCP 9, RFC 2026, October 1996. 3", BCP 9, RFC 2026, October 1996.
[RFC3716] Advisory, IAB., "The IETF in the Large: Administration and [RFC3716] Advisory, IAB., "The IETF in the Large: Administration and
Execution", RFC 3716, March 2004. Execution", RFC 3716, March 2004.
[RFC3777] Galvin, J., "IAB and IESG Selection, Confirmation, and [RFC3777] Galvin, J., "IAB and IESG Selection, Confirmation, and
Recall Process: Operation of the Nominating and Recall Recall Process: Operation of the Nominating and Recall
Committees", BCP 10, RFC 3777, June 2004. Committees", BCP 10, RFC 3777, June 2004.
11.2 Informative References 11.2 Informative References
[ISOC] Internet Society, "Internet Society By-Laws", February [ISOC] Internet Society, "Internet Society By-Laws", February
2001, 2001,
<http://www.isoc.org/isoc/general/trustees/bylaws.shtml>. <http://www.isoc.org/isoc/general/trustees/bylaws.shtml>.
[RFC2031] Huizer, E., "IETF-ISOC relationship", RFC 2031, October [RFC2031] Huizer, E., "IETF-ISOC relationship", RFC 2031, October
1996. 1996.
[RFC2629] Rose, M., "Writing I-Ds and RFCs using XML", RFC 2629, [RFC2629] Rose, M., "Writing I-Ds and RFCs using XML", RFC 2629,
June 1999. June 1999.
[RFC2850] Internet Architecture Board and B. Carpenter, "Charter of [RFC2850] Internet Architecture Board and B. Carpenter, "Charter of
the Internet Architecture Board (IAB)", BCP 39, RFC 2850, the Internet Architecture Board (IAB)", BCP 39, RFC 2850,
May 2000. May 2000.
[RFC3233] Hoffman, P. and S. Bradner, "Defining the IETF", BCP 58, [RFC3233] Hoffman, P. and S. Bradner, "Defining the IETF", BCP 58,
RFC 3233, February 2002. RFC 3233, February 2002.
[RFC3677] Daigle, L. and Internet Architecture Board, "IETF ISOC [RFC3677] Daigle, L. and Internet Architecture Board, "IETF ISOC
Board of Trustee Appointment Procedures", BCP 77, Board of Trustee Appointment Procedures", BCP 77,
RFC 3677, December 2003. RFC 3677, December 2003.
[RFC3710] Alvestrand, H., "An IESG charter", RFC 3710, February [RFC3710] Alvestrand, H., "An IESG charter", RFC 3710, February
2004. 2004.
Austein & Wijnen Expires August 15, 2005 [Page 21] Austein & Wijnen Expires August 2, 2005 [Page 20]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
Authors' Addresses Authors' Addresses
Rob Austein (editor) Rob Austein (editor)
Internet Systems Consortium Internet Systems Consortium
950 Charter Street 950 Charter Street
Redwood City, CA 94063 Redwood City, CA 94063
USA USA
EMail:
Email: sra@isc.org sra@isc.org
Bert Wijnen (editor) Bert Wijnen (editor)
Lucent Technologies Lucent Technologies
Schagen 33 Schagen 33
3461 GL Linschoten 3461 GL Linschoten
NL NL
EMail:
Phone: +31-348-407-775
Email: bwijnen@lucent.com bwijnen@lucent.com
Appendix A. Change Log Appendix A. Change Log
Note to RFC Editor: Please remove this appendix (including all of Note to RFC Editor: Please remove this appendix (including all of
its subsections) prior to publication. its subsections) prior to publication.
This document was produced as part of the overall IETF Administrative This document was produced as part of the overall IETF Administrative
Restructuring (AdminRest) effort. Information about the effort and Restructuring (AdminRest) effort. Information about the effort and
related documents can be found at: related documents can be found at:
http://www.alvestrand.no/ietf/adminrest http://www.alvestrand.no/ietf/adminrest
We are using an issue tracker to track the editorial and substantive We are using an issue tracker to track the editorial and substantive
feedback on this document. It can be found at: feedback on this document. It can be found at:
https://rt.psg.com (user: ietf, password: ietf, queue: iasa-bcp). https://rt.psg.com (user: ietf, password: ietf, queue: iasa-bcp).
This text corresponds to $Revision: 1.1 $ of the XML source for this This text corresponds to $Revision: 1.1 $ of the XML source for this
document. document.
A.1 Changes in draft-ietf-iasa-bcp-07.txt A.1 Changes in
o A number of editorial fixes based on suggestions by ISOC's legal
counsel, issue 845.
o Clarified ISOC BoT role in appeals, issue 843.
o Added preference for no ongoing payment for software licenses in
section 3.1.
Austein & Wijnen Expires August 15, 2005 [Page 22]
Internet-Draft Structure of IASA February 2005
A.2 Changes in draft-ietf-iasa-bcp-06.txt draft-ietf-iasa-bcp-06.txt
o Editorial fix about reporting in first para of Section 5.1 as per o Editorial fix about reporting in first para of Section 5.1 as per
issue 787. issue 787.
o Clarified (as per email from Scott Bradner) when exactly an IOAC o Clarified (as per email from Scott Bradner) when exactly an IOAC
term ends. term ends.
o Clarified the wording on IAOC members not receiving compensation o Clarified the wording on IAOC members not receiving compensation
for their services from IASA, ISOC or IETF. As per a comment from for their services from IASA, ISOC or IETF. As per a comment from
Austein & Wijnen Expires August 2, 2005 [Page 21]
Internet-Draft Structure of IASA February 2005
Russ Housley, issue 831. Russ Housley, issue 831.
o Changed text so that 2/3 of voting IAOC members are required to o Changed text so that 2/3 of voting IAOC members are required to
remove IAOC chair. As per issue 826. remove IAOC chair. As per issue 826.
o Clarify IASA tasks/responsibility for IPR matters as per issues o Clarify IASA tasks/responsibility for IPR matters as per issues
820 and 825. 820 and 825.
o Replaced earlier strawman sections "Business Decisions" and "IASA o Replaced earlier strawman sections "Business Decisions" and "IASA
Responsiveness to IETF" with a new section Section 3.5 as the Responsiveness to IETF" with a new section Section 3.5 as the
agreed upon text for issue 725. The new text also addresses issue agreed upon text for issue 725. The new text also addresses issue
792. 792.
A.2
A.3 Changes in draft-ietf-iasa-bcp-05.txt Changes in draft-ietf-iasa-bcp-05.txt
o Editorial fixes and cleanup o Editorial fixes and cleanup
o Changed "unanimous" to "consensus" with text smoothing in o Changed "unanimous" to "consensus" with text smoothing in
Section 3.4 per mailing list discussion (issue 746). Section 3.4 per mailing list discussion (issue 746).
o Fixed definitions of IAD and IAOC in Section 2.1. o Fixed definitions of IAD and IAOC in Section 2.1.
o Adapted text for "Effective Date for Commencement of IASA" as per o Adapted text for "Effective Date for Commencement of IASA" as per
resolution of issue 739. resolution of issue 739.
o Added text under "IAD responsibilities" about protection of o Added text under "IAD responsibilities" about protection of
personal data. Part of issue 819. personal data. Part of issue 819.
o Editorial changes as agreed to per issue 819. o Editorial changes as agreed to per issue 819.
o Modified "Transparency" text in Section 7 as per issue 787. o Modified "Transparency" text in Section 7 as per issue 787.
o Editorial changes on the budget text in various places. This to o Editorial changes on the budget text in various places. This to
achieve better consistency as per issue 786. achieve better consistency as per issue 786.
o Replacement text for "outsourcing" as per issue 788. o Replacement text for "outsourcing" as per issue 788.
Austein & Wijnen Expires August 15, 2005 [Page 23]
Internet-Draft Structure of IASA February 2005
o Another simplification for the operational reserve as per issue o Another simplification for the operational reserve as per issue
789. Some of the discussion also took place under issue 795. 789. Some of the discussion also took place under issue 795.
o Added text to say we obey the law as per issue 793. o Added text to say we obey the law as per issue 793.
o Reworded text about the IAD hiring and firing committee to include o Reworded text about the IAD hiring and firing committee to include
a Nomcom selected IAOC member. Issue 818. a Nomcom selected IAOC member. Issue 818.
o Added text for trademark responsibility. Issue 821. o Added text for trademark responsibility. Issue 821.
Austein & Wijnen Expires August 2, 2005 [Page 22]
Internet-Draft Structure of IASA February 2005
o Added text that legal review is needed for contracts. Issue 822. o Added text that legal review is needed for contracts. Issue 822.
o Legal Editorial changes as per issue 823. o Legal Editorial changes as per issue 823.
o Changed "Divisional Accounting" into "Cost Center Accounting" as o Changed "Divisional Accounting" into "Cost Center Accounting" as
per discussions with ISOC Accounting Experts and as per per discussions with ISOC Accounting Experts and as per
discussions on issue 787. Changes are in Section 5.1. This discussions on issue 787. Changes are in Section 5.1. This
included a change to add text about "general ledger accounts" in included a change to add text about "general ledger accounts" in
this same section as per issue 794. this same section as per issue 794.
o Added "Business Decisions" and "IASA Responsiveness to IETF" o Added "Business Decisions" and "IASA Responsiveness to IETF"
sections as a strawman that tries to address the issues on review sections as a strawman that tries to address the issues on review
and appeals (issues 720, 725 and 792). and appeals (issues 720, 725 and 792).
o Added "software" to principle 7 as per issue 820. o Added "software" to principle 7 as per issue 820.
o Replaced text in Section 3.1 as per the legal advise from Jorge o Replaced text in Section 3.1 as per the legal advise from Jorge
and per discussion regarding issue 820. and per discussion regarding issue 820.
A.3
A.4 Changes in draft-ietf-iasa-bcp-04.txt Changes in draft-ietf-iasa-bcp-04.txt
o Removed Editors' Note in section on "Designated Donations", since o Removed Editors' Note in section on "Designated Donations", since
the text seems to have settled. the text seems to have settled.
o Reworded principle 8, per "IASA Finances" posting. o Reworded principle 8, per "IASA Finances" posting.
o Reworded Section 5.6 per "IASA Finances" posting. The text o Reworded Section 5.6 per "IASA Finances" posting. The text
changes address issues 740, 748, 769 and 772. changes address issues 740, 748, 769 and 772.
o Added text regarding compensation and reimbursement of expenses o Added text regarding compensation and reimbursement of expenses
for IAOC members, to address issue 770. for IAOC members, to address issue 770.
o Reworded Removability text in Section 7 per "IASA removability - o Reworded Removability text in Section 7 per "IASA removability -
rephrase IAOC role" discussion on the IETF list, to address issue rephrase IAOC role" discussion on the IETF list, to address issue
779. 779.
o Reworded text about IAOC minutes (Section 3.4), issue 718. o Reworded text about IAOC minutes (Section 3.4), issue 718.
Austein & Wijnen Expires August 15, 2005 [Page 24]
Internet-Draft Structure of IASA February 2005
o Reworded Section 5.1 ("Divisional Accounting") per issue 721. o Reworded Section 5.1 ("Divisional Accounting") per issue 721.
o Reworded Section 5.4 ("Other ISOC Support") per issue 722. o Reworded Section 5.4 ("Other ISOC Support") per issue 722.
o A little rewording of text on donations in support for IETF, per o A little rewording of text on donations in support for IETF, per
issue 737. issue 737.
o Reworded text on outsourcing and in-house work, per issue 733. o Reworded text on outsourcing and in-house work, per issue 733.
Austein & Wijnen Expires August 2, 2005 [Page 23]
Internet-Draft Structure of IASA February 2005
o Reduced the text on IAOC decision making (Section 3.4) quite a o Reduced the text on IAOC decision making (Section 3.4) quite a
bit, per issue 746. bit, per issue 746.
o Modified text on IAOC chair selection and authority (Section 4), o Modified text on IAOC chair selection and authority (Section 4),
per issue 771. per issue 771.
A.4
A.5 Changes in draft-ietf-iasa-bcp-03.txt Changes in draft-ietf-iasa-bcp-03.txt
o Removed "Closed Issues" section, replaced "Open Issues" section o Removed "Closed Issues" section, replaced "Open Issues" section
with another pointer to the RT ticket queue, since that is now with another pointer to the RT ticket queue, since that is now
more likely to be up-to-date than any list in this document. more likely to be up-to-date than any list in this document.
o Added text that IAOC specifies and publishes rules for conflict o Added text that IAOC specifies and publishes rules for conflict
resolution. See issue #754. resolution. See issue #754.
o Changed text on quarterly credits to IASA accounts as per o Changed text on quarterly credits to IASA accounts as per
discussion in issue #748. Issue seems not closed yet. discussion in issue #748. Issue seems not closed yet.
o Clarifications in budget process, see issue #749. o Clarifications in budget process, see issue #749.
o Editorial change on wording "rights in data" as per issue #735. o Editorial change on wording "rights in data" as per issue #735.
o Editorial changes as per issue #727. o Editorial changes as per issue #727.
o Clarified text about requirements for in-house and outsourced o Clarified text about requirements for in-house and outsourced
activities. Issue #723. activities. Issue #723.
o Added text about how an IAOC vacancy is dealt with. Issue #741. o Added text about how an IAOC vacancy is dealt with. Issue #741.
o Removed a redundant sentence on donation coordination. Issue o Removed a redundant sentence on donation coordination. Issue
#738. #738.
o Added text to state that IAOC decisions are minuted and minutes o Added text to state that IAOC decisions are minuted and minutes
are published. Issues #714 and #718. are published. Issues #714 and #718.
o Refined text on removability (BCP doc) as per issue #751. o Refined text on removability (BCP doc) as per issue #751.
o Removed word "officer" from text, as per issue #731. o Removed word "officer" from text, as per issue #731.
Austein & Wijnen Expires August 15, 2005 [Page 25]
Internet-Draft Structure of IASA February 2005
o Added a 2nd paragraph on IAOC decision making rules. Issue #746. o Added a 2nd paragraph on IAOC decision making rules. Issue #746.
o Added text at the end of Section 3.2 to make IAOC responsible for o Added text at the end of Section 3.2 to make IAOC responsible for
filling in if there is no IAD or when IAD is not available. Issue filling in if there is no IAD or when IAD is not available. Issue
#744. #744.
o Clarified text in 2nd principle. Issue #730. o Clarified text in 2nd principle. Issue #730.
Austein & Wijnen Expires August 2, 2005 [Page 24]
Internet-Draft Structure of IASA February 2005
o Added IETF to Section 2.1. Issue #743. o Added IETF to Section 2.1. Issue #743.
o Changed wording of 3rd principle in Section 2.2 to make it clearer o Changed wording of 3rd principle in Section 2.2 to make it clearer
that budget development is an iterative process that happens in that budget development is an iterative process that happens in
cooperation with ISOC. cooperation with ISOC.
o Added a principle about the fact that IETF money stays IETF money o Added a principle about the fact that IETF money stays IETF money
once credited to IETF accounts. once credited to IETF accounts.
o Changed the word "account" into "accounts" at a few places to be o Changed the word "account" into "accounts" at a few places to be
more in line with the concept of divisional accounting. more in line with the concept of divisional accounting.
A.5
A.6 Changes in draft-ietf-iasa-bcp-02.txt Changes in draft-ietf-iasa-bcp-02.txt
o Split issues list into separate lists of open issues and closed o Split issues list into separate lists of open issues and closed
issues (as seen by the editors). Removed some inline Editors' issues (as seen by the editors). Removed some inline Editors'
comments when we believed that an issue has been resolved. comments when we believed that an issue has been resolved.
o Added Section 2.5 on when the procedures in this document become o Added Section 2.5 on when the procedures in this document become
effective. effective.
o Changed text in Section 5 to state that the goal is a viable IASA o Changed text in Section 5 to state that the goal is a viable IASA
based on all funding as opposed to just meeting fees and based on all funding as opposed to just meeting fees and
designated donations. designated donations.
o Added text to Section 2.2 stating that funds and donations shall o Added text to Section 2.2 stating that funds and donations shall
be irrevocably assigned to IETF. be irrevocably assigned to IETF.
o Removed section on IAD Committees. o Removed section on IAD Committees.
o Changed the text in Section 4 on IAOC Chair selection and o Changed the text in Section 4 on IAOC Chair selection and
responsibilities. It is now very similar to IAB chair selection responsibilities. It is now very similar to IAB chair selection
as in RFC2850. as in RFC2850.
o Various textual clarifications. This also includes several o Various textual clarifications. This also includes several
changes of "will" and "should" into "shall". changes of "will" and "should" into "shall".
o Moved disclaimer of variance procedure to Section 3 and o Moved disclaimer of variance procedure to Section 3 and
generalized it. generalized it.
Austein & Wijnen Expires August 15, 2005 [Page 26]
Internet-Draft Structure of IASA February 2005
o Improved wording on IPR in Section 2.2 and added specific text for o Improved wording on IPR in Section 2.2 and added specific text for
IAD to ensure we have proper rights to any IPR. IAD to ensure we have proper rights to any IPR.
o Cleaned up wording on accounting to make sure it is all in sync
with the divisional accounting described in Section 5.1. Section 5.1
o Cleanup Section 7. o Cleanup Section 7.
Austein & Wijnen Expires August 2, 2005 [Page 25]
Internet-Draft Structure of IASA February 2005
A.6
A.7 Changes in draft-ietf-iasa-bcp-01.txt Changes in draft-ietf-iasa-bcp-01.txt
o Added a list of open issues (Section 1.1). o Added a list of open issues (Section 1.1).
o Added that small committee determines initial compensation for o Added that small committee determines initial compensation for
IAD. IAD.
o Added a set of Principles (Section 2.2) on which any details are o Added a set of Principles (Section 2.2) on which any details are
(should be) based. (should be) based.
o Added "Community Consensus and Grant of Authority" (Section 2.3). o Added "Community Consensus and Grant of Authority" (Section 2.3).
o Added more acknowledgments (no doubt still incomplete). o Added more acknowledgments (no doubt still incomplete).
o Clarified Section 5 and subsections. Added Editors' note. o Clarified Section 5 and subsections. Added Editors' note.
o Clarified what happens if IAOC voting results in a tie. o Clarified what happens if IAOC voting results in a tie.
o Changed the selection of person(s) to act as IETF Executive o Changed the selection of person(s) to act as IETF Executive
Director. Director.
o Added a disclaimer in Section 5, stating that IAOC can deal with o Added a disclaimer in Section 5, stating that IAOC can deal with
changes because of legal, accounting or practical reasons. changes because of legal, accounting or practical reasons.
o Removed "insurance" example in Section 5.4. o Removed "insurance" example in Section 5.4.
o Added a reference to ISOC bylaws. o Added a reference to ISOC bylaws.
o Stop using term "liaison" to mean "non-voting IAOC member"; o Stop using term "liaison" to mean "non-voting IAOC member";
instead, spell out which members are voting and which are not. instead, spell out which members are voting and which are not.
Add text allowing IAOC to request non-voting liaisons from other Add text allowing IAOC to request non-voting liaisons from other
bodies. bodies.
o Various editorial cleanups. o Various editorial cleanups.
A.7
A.8 Changes in draft-ietf-iasa-bcp-00.txt Changes in draft-ietf-iasa-bcp-00.txt
Austein & Wijnen Expires August 15, 2005 [Page 27]
Internet-Draft Structure of IASA February 2005
o Modified the text of Section 5. o Modified the text of Section 5.
o Added text on Reserve funds. o Added text on Reserve funds.
o Made IAB chair a voting member of IAOC; added tie-breaker rule o Made IAB chair a voting member of IAOC; added tie-breaker rule
that if voting results in equal split, then IAOC chair decides. that if voting results in equal split, then IAOC chair decides.
o Changed 2nd paragraph in "Structure of IASA" section to replace o Changed 2nd paragraph in "Structure of IASA" section to replace
the fuzzy term "executive-level" and to be clear about cost the fuzzy term "executive-level" and to be clear about cost
aspects. aspects.
Austein & Wijnen Expires August 2, 2005 [Page 26]
Internet-Draft Structure of IASA February 2005
o Made it explicit that the IESG's role as a confirming body only o Made it explicit that the IESG's role as a confirming body only
applies to IAOC appointments made by the NomCom. applies to IAOC appointments made by the NomCom.
o Editorial changes at various places in the document. o Editorial changes at various places in the document.
A.8
A.9 Changes in draft-wasserman-iasa-bcp-01.txt Changes in draft-wasserman-iasa-bcp-01.txt
o Adjusted the description of the IAD role and reporting structure o Adjusted the description of the IAD role and reporting structure
to make it clear that the IAD is expected to serve as to make it clear that the IAD is expected to serve as
executive-level management for IASA, with only high-level executive-level management for IASA, with only high-level
direction (not day-to-day management) from the IAOC. direction (not day-to-day management) from the IAOC.
o Removed some troublesome wording regarding termination of the IAD o Removed some troublesome wording regarding termination of the IAD
by the ISOC President/CEO. by the ISOC President/CEO.
o Moved the initial IAOC selection into a separate section and added o Moved the initial IAOC selection into a separate section and added
some text describing how and when the initial IAOC will be seated. some text describing how and when the initial IAOC will be seated.
o Added the concept of IAD committees, largely taken from Leslie o Added the concept of IAD committees, largely taken from Leslie
Daigle's original AdminRest proposal. Daigle's original AdminRest proposal.
o Performed some general text editing and clean-up. o Performed some general text editing and clean-up.
A.9
A.10 Origin of draft-wasserman-iasa-bcp-00.txt Origin of draft-wasserman-iasa-bcp-00.txt
draft-wasserman-iasa-bcp-00.txt was derived from an e-mail message draft-wasserman-iasa-bcp-00.txt was derived from an e-mail message
written by Leslie Daigle and Margaret Wasserman and posted to the written by Leslie Daigle and Margaret Wasserman and posted to the
IETF by Leslie Daigle. The original message can be found at: IETF by Leslie Daigle. The original message can be found at:
http://www1.ietf.org/mail-archive/web/ietf/current/msg31326.html http://www1.ietf.org/mail-archive/web/ietf/current/msg31326.html
This document was derived from the "Draft BCP" portion of that This document was derived from the "Draft BCP" portion of that
message and has been updated based on comments received. message and has been updated based on comments received.
Austein & Wijnen Expires August 15, 2005 [Page 28] Austein & Wijnen Expires August 2, 2005 [Page 27]
Internet-Draft Structure of IASA February 2005 Internet-Draft Structure of IASA February 2005
Intellectual Property Statement Intellectual Property Statement
The IETF takes no position regarding the validity or scope of any The IETF takes no position regarding the validity or scope of any
Intellectual Property Rights or other rights that might be claimed to Intellectual Property Rights or other rights that might be claimed to
pertain to the implementation or use of the technology described in pertain to the implementation or use of the technology described in
this document or the extent to which any license under such rights this document or the extent to which any license under such rights
might or might not be available; nor does it represent that it has might or might not be available; nor does it represent that it has
made any independent effort to identify any such rights. Information made any independent effort to identify any such rights. Information
on the procedures with respect to rights in RFC documents can be on the procedures with respect to rights in RFC documents can be
found in BCP 78 and BCP 79. found in BCP 78 and BCP 79.
Copies of IPR disclosures made to the IETF Secretariat and any Copies of IPR disclosures made to the IETF Secretariat and any
assurances of licenses to be made available, or the result of an assurances of licenses to be made available, or the result of an
attempt made to obtain a general license or permission for the use of attempt made to obtain a general license or permission for the use of
such proprietary rights by implementers or users of this such proprietary rights by implementers or users of this
specification can be obtained from the IETF on-line IPR repository at specification can be obtained from the IETF on-line IPR repository at
http://www.ietf.org/ipr. http://www.ietf.org/ipr.
The IETF invites any interested party to bring to its attention any The IETF invites any interested party to bring to its attention any
copyrights, patents or patent applications, or other proprietary copyrights, patents or patent applications, or other proprietary
rights that may cover technology that may be required to implement rights that may cover technology that may be required to implement
this standard. Please address the information to the IETF at this standard. Please address the information to the IETF at
ietf-ipr@ietf.org. ietf-ipr@ietf.org.
Disclaimer of Validity Disclaimer of Validity
This document and the information contained herein are provided on an This document and the information contained herein are provided on an
"AS IS" basis and THE CONTRIBUTOR, THE ORGANIZATION HE/SHE REPRESENTS "AS IS" basis and THE CONTRIBUTOR, THE ORGANIZATION HE/SHE REPRESENTS
OR IS SPONSORED BY (IF ANY), THE INTERNET SOCIETY AND THE INTERNET OR IS SPONSORED BY (IF ANY), THE INTERNET SOCIETY AND THE INTERNET
ENGINEERING TASK FORCE DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, ENGINEERING TASK FORCE DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO ANY WARRANTY THAT THE USE OF THE INCLUDING BUT NOT LIMITED TO ANY WARRANTY THAT THE USE OF THE
INFORMATION HEREIN WILL NOT INFRINGE ANY RIGHTS OR ANY IMPLIED INFORMATION HEREIN WILL NOT INFRINGE ANY RIGHTS OR ANY IMPLIED
WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.
Copyright Statement Copyright Statement
Copyright (C) The Internet Society (2005). This document is subject Copyright (C) The Internet Society (2005). This document is subject
to the rights, licenses and restrictions contained in BCP 78, and to the rights, licenses and restrictions contained in BCP 78, and
except as set forth therein, the authors retain all their rights. except as set forth therein, the authors retain all their rights.
Acknowledgment Acknowledgment
Funding for the RFC Editor function is currently provided by the Funding for the RFC Editor function is currently provided by the
Internet Society. Internet Society.
Austein & Wijnen Expires August 15, 2005 [Page 29] Austein & Wijnen Expires August 2, 2005 [Page 28]